4. Loosen jam nut (FIG. 33-1B)
on the STOW switch adjust-
ment screw. Next, turn adjust-
ment screw counter-clockwise
(CCW) (FIG. 33-2) until con-
troller reads UNFOLD. Turn
adjustment screw clockwise
(CW) (FIG. 33-3) until con-
troller reads STOWED*. Then,
turn the adjustment screw 1/2
turn CW (FIG. 33-4).
6. When adjustment is complete, tighten
jam nut on the adjustment screw
(FIG. 33-1B).
5. Use the hand pendant to stow Lift
(FIG. 29-3). Make sure the platform
is stowed tightly. Repeat adjustment
steps 1 through 4 if necessary.
STOW SWITCH ADJUSTMENT
FIG. 33-1B
ADJUSTMENT
SCREW
LH TOWER
(LIFT WITH LH PUMP)
FIG. 33-1A
JAM NUT
LIFT TO
REMOVE
3. Remove cover from top of tower
(FIG. 33-1A).
7. Reinstall cover on tower (FIG. 33-1A).
COVER
ADJUST SO CONTROLLER READS “UNFOLD”
FIG. 33-2
CCW
CW
UNFOLD
STOWED*
+ 1/2-TURN CW
ADJUSTMENT SCREW
FIG. 33-4
ADJUST SO CONTROLLER READS “STOWED* ”
FIG. 33-3