Maxon WL7 Spezifikationen Seite 20

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 87
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 19
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
20
PATENTS PENDING
2. Open the release valve (FIG. 20-1)
counter-clockwise with the Backup
Pump Handle. As the Lift starts to
unfold and rests against the latches
(FIG. 20-2), close the release
valve (FIG. 20-1) by turning clock-
wise.
USING BACKUP PUMP TO UNFOLD
(LIFT WITH LH PUMP)
FIG. 20-1
LIFT RESTING ON
LATCHES
FIG. 20-2
NOTE: After pressure release valve is
opened, you have 5 minutes
to do the adjustment before
the Controller repressurizes
hydraulic system and stows
the Lift.
RELEASE
VALVE
BACKUP PUMP
HANDLE
NOTE: The STOW switch adjustment
screw is always on the same
side of the Lift as the Pump
Cover (FIG. 20-3).
RH PUMP
LH PUMP
ADJUSTMENT
SCREW
WHERE TO FIND ADJUSTMENT SCREW
FIG. 20-3
STOW SWITCH ADJUSTMENT - Continued
Seitenansicht 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 86 87

Kommentare zu diesen Handbüchern

Keine Kommentare