
PATENTS PENDING 26
MANUAL PUMP OPERATION
LOADING & UNLOADING OCCUPANT
1. Reposition latches to
manually unfold the Lift
as follows. Raise latch
off anchor pin (FIG. 26-
1A) on LH side of Lift.
Position the standoff to
hold latch in place above
the anchor pin (FIG.
26-1B). Repeat for
latch on RH side of Lift.
LIFT - BACK VIEW
FIG. 26-1A
REPOSITIONED
LATCH & STANDOFF
FIG. 26-1B
LATCH
ANCHOR
PIN
STANDOFF
2. Remove the manual backup
handle from clips on the pump
cover (FIG. 26-2).
MANUAL BACKUP HANDLE
(LH PUMP SHOWN)
FIG. 26-2
PUMP
COVER
HANDLE
Kommentare zu diesen Handbüchern